Rehabilitate 1st Floor Lecture Halls: Demolition

IMG_3525.JPG


20140102_074809.jpg


20140102_074752.jpg


2nd Floor Construction Progress

IMG_2486.jpg

2nd Floor Lounge (218)

IMG_2487.jpg

2nd Floor South Corridor (200D)

IMG_2502.jpg

2nd Floor Lecture/Seminar Room (220)

DSC_0931.jpg

2nd Floor Methods Lab (223)

IMG_2491.jpg

2nd Floor Methods Lab (223)

IMG_2490.jpg

2nd Floor Methods Lab (223)

IMG_2498.jpg

2nd Floor Methods Lab (223)

2nd Floor Construction Progress

IMG_2144.jpg

Floor Glass Framing and Light Fixture


IMG_2146.jpg

Floor Glass Framing in place

2nd Floor Construction Progress

IMG_1757.JPG

2nd Floor Lockers Area

IMG_1761.JPG

2nd Floor Framing, Ductwork and Light Fixture

 

2nd Floor Construction Progress

IMG_1694.JPG

2nd Floor Framing, Ductwork and Light Fixture

IMG_1695.JPG

2nd Floor Framing, Ductwork and Light Fixture

IMG_1707.JPG

2nd Floor Framing and Ductwork

IMG_1710.JPG

2nd Floor Framing, Ductwork and Light Fixture

2nd Floor and Stair D Construction Progress

IMG_1620.JPG
2nd Floor Framing


IMG_1621.JPG

2nd Floor Framing


IMG_1629.JPG

2nd floor Seminar Room


IMG_1640.jpg

Stair D


2nd Floor Construction Progress

IMG_0857.jpg
2nd Floor Framing


IMG_0859.jpg
2nd Floor Framing

IMG_0861.jpg
2nd Floor Framing

2nd Floor Demolition is Completed

IMG_0501.JPG
Second Floor

IMG_0503.JPG
Second Floor

IMG_0505.JPG
Second Floor

2nd Floor Demolition

IMG_4395.JPG

IMG_4396.JPG


3M Fitness Center space

IMG_4391.JPG

IMG_4392.JPG