After the abatement, we have started the demolition

100_3277.jpg
3rd Floor Studio Demolition

100_3293.jpg
3rd Floor Studio Demolition

100_3282.jpg
 3rd Floor Control Room Demolition

Pre-abatement Demolition and Preparation

41049-023.jpg
3rd Floor Bathroom Chase Pre-abatement Demolition

41049-025.jpg
3rd Floor Studio Pre-abatement Demolition

41049-037.jpg
3rd Floor Mechanical Room Pre-abatement Demolition

41049-048.jpg
3rd Floor Studio Pre-abatement Demolition

BB-41049-01.jpg
3M Women's bathroom Pre-abatement Demolition

41049-018.jpg
3rd Floor Studio Pre-abatement Air Monitoring

41049-017.jpg
3rd Floor Studio Pre-abatement Preparation

News Alert

This news alert is for next Friday April 15th, 2011 the entire 2nd floor will be shut down and sealed off at 6 p.m.  No access will be allowed until Monday April 18th, 2011.  Students should make sure that they have everything they need out of their lockers by no later than 6 p.m. for next Friday April 15th.  No exceptions will be made and no access will be allowed after 6 p.m.  Once the abatement process is completed then air monitoring testing will be conducted to allow for proper clearance.  The 2nd floor will be reopened by Monday 8 a.m. April 18th for regular normal access and use.


Thank you for your cooperation on this necessary segment of this construction project.

Frank Orehek
Director of Management Services/Chief of Police
33 West 42nd Street
New York, NY 10036
Forehek@sunyopt.edu
212-938-5582
212-938-5585

Photos for construction progress


41049-045.jpg
Construction sign on 2nd floor

41049-051.jpg
New temp vending area

41049-068.jpg
Construction site office

41049-072.jpg
Temp construction door and partition on 3rd floor