December 2012 Archives

2nd Floor Construction Progress

IMG_1757.JPG

2nd Floor Lockers Area

IMG_1761.JPG

2nd Floor Framing, Ductwork and Light Fixture

 

2nd Floor Construction Progress

IMG_1694.JPG

2nd Floor Framing, Ductwork and Light Fixture

IMG_1695.JPG

2nd Floor Framing, Ductwork and Light Fixture

IMG_1707.JPG

2nd Floor Framing and Ductwork

IMG_1710.JPG

2nd Floor Framing, Ductwork and Light Fixture