Recently in Photos Category

2nd Floor Construction Progress

IMG_1757.JPG

2nd Floor Lockers Area

IMG_1761.JPG

2nd Floor Framing, Ductwork and Light Fixture

 

2nd Floor Construction Progress

IMG_1694.JPG

2nd Floor Framing, Ductwork and Light Fixture

IMG_1695.JPG

2nd Floor Framing, Ductwork and Light Fixture

IMG_1707.JPG

2nd Floor Framing and Ductwork

IMG_1710.JPG

2nd Floor Framing, Ductwork and Light Fixture

3rd floor and 3M Progress

IMG_4088.jpg
3rd Floor New Bathroom

IMG_4090.jpg
3rd Floor student center

IMG_4098.jpg
3rd Floor Student Center Ceiling

IMG_4100.jpg
3rd Floor New Pantry/Kitchen
 
IMG_4107.jpg
3M Fitness Center






3rd Floor Student Center Progress

IMG_3671.jpg
3rd Floor Lockers Space

IMG_3670.jpg
3rd Floor Student Center 

IMG_3666.jpg
Fitness Center space

3rd Floor Project Progress

IMG_3011.jpg
Student Center Window on 42nd street

IMG_3045.jpg
New Elevator Openings on 3M

IMG_3048.jpg
3rd Floor Student Center   

IMG_3055.jpg
New Mail Box area on 3rd Floor

Photos for Construction Progress

IMG_1342.jpg

3M new elevator door opening

IMG_1345.jpg
2nd floor locker area

Steel Beams Installation in 3rd Floor Studio

0939.jpg
Steel beam installation 3rd floor studio

IMG_1112.jpg
Steel beam installation 3rd floor studio
 


Progress Pictures July 2011

IMG_0985.jpg
Alt 1 work,  Security Equipment Room 3M

IMG_0987.jpg
New HVAC Air Ducts and Dampers

IMG_0991.jpg
3rd Floor New Media Office Space

IMG_0995.jpg
Second Floor New Locker Space 




Demolition almost complete!

IMG_0908.jpg
Bryant Park from 3rd floor 

IMG_0912.jpg
3rd Floor Studio 
IMG_0920.jpg
3rd floor south side, looking down from 3M. 

IMG_0923.jpg
3M original Steel truss 
 

3rd Floor Studio Demolition

022.jpg

Cutting steel is a "sparkling job"

IMG_0505.jpg

Looking down from 3M

IMG_0501.jpg

Looking North from 42nd street side of the studio

015.jpg

East-South corner of 3rd floor Studio